Добавить новость

Chennai Metro route & timings: New Poonamallee–Vadapalani stretch opens with 11 stations; when can passengers board trains?

Chennai Metro timings: Prime Minister Narendra Modi inaugurated the 15-km Poonamallee-Vadapalani stretch of Chennai Metro Phase II on Sunday, alongside Tamil Nadu Chief Minister C Joseph Vijay. Built at a cost of around Rs 4,900 crore, the route has 11 elevated stations and a 3.7-km double-decker structure. Passenger services began on October 11, with regular operations scheduled from 7 am to 9 pm from October 12.
Губернаторы России



Заголовки
Заголовки
Moscow.media
Ria.city

Новости России




Rss.plus

Музыкальные новости


Новости тенниса







Новости спорта